SAM_5342

New concrete pad, ready for new tank and bund.

 

SAM_5347

Unloading of the bund.

SAM_5354

Re-furbished existing steelwork.

SAM_5358

Unloading the tank.

SAM_5367

Lifting the tank into position.

SAM_5376

Completed installation including re-installed steelwork and pipework.